Structural stages
During structural work, platforms may be needed for access to formwork, reinforcement and concrete operations. Modular configurations can be arranged and re-arranged as the structure rises and conditions on site change.
Envelope and facade
As the project moves to cladding, glazing and external finishes, access requirements shift to the building perimeter. Modular platforms can be reconfigured to follow the work around the facade.
Internal fit-out
During fit-out, multiple trades may need access to different floor levels and ceiling heights. Internal platform and trestle configurations can provide working access without relying on external arrangements.
Reconfiguration, not replacement
Across all of these stages, the goal is to reconfigure the access arrangement using the same core components, rather than deploying entirely different equipment for each phase of the commercial build.